Proposed Construction of an Ablution Block, 10No. for Boys with 2No. Urinal, 18No. for Girls and 4No. for PWDs and connection to the sewerline at Zimmerman Secondary School in Roysambu Constituency

Open: 29 Aug, 2022 Close: 7 Sep, 2022
Select a Plan