Design, Build and Commission a Fully-Fledged, TurnKey, Integrated Modular Sterile Drug Products Manufacturing Facility for Human Vaccines, With In Licensing and Technology Transfer

Open: 18 Jan, 2022 Close: 31 Jan, 2022
Select a Plan